← Manufacturing
Step 08 Facility & Infrastructure

HVAC/HEPA Filtration System

Trane / AAF International HEPA CRITICAL ● ISO 5-7 cleanroom environment maintains sub-µm particle counts for lithography

Role in QLT Fabrication

Every nanoscale feature on the QLT photonic chip — 900 nm waveguides, 150 nm taper tips, 250 nm Poovey switch air gaps — is vulnerable to particle contamination. A single 0.5 µm particle landing on a waveguide during lithography or deposition creates a scattering defect that can add 0.1–1.0 dB of excess loss, potentially ruining a die. The HVAC/HEPA system creates and maintains the controlled cleanroom environment that makes sub-micron fabrication possible.

The cleanroom environment controls far more than just particles:

  • Particle control ● HEPA/ULPA filtration removes airborne contaminants ≥ 0.12 µm that cause defects in lithography, deposition, and etch processes
  • Temperature stability ● ±0.1°C in the lithography bay prevents thermal expansion/contraction of photomasks and wafers that would cause overlay errors exceeding 10 nm
  • Humidity control ● ±1% RH prevents photoresist absorption of moisture (causes scumming and CD variation), electrostatic discharge damage to devices, and condensation on chilled optical surfaces
  • Chemical vapor removal ● Activated carbon and chemical filters remove airborne molecular contamination (AMC) — volatile organics, acids, bases — that deposit on wafer surfaces and degrade film adhesion
  • Positive pressure ● Cleanroom operates at +0.03–0.05" w.g. relative to surrounding spaces, preventing infiltration of unfiltered air through doors and pass-throughs
  • Laminar flow ● Unidirectional (vertical) airflow at 0.3–0.5 m/s sweeps particles downward into return plenums, preventing recirculation across wafer surfaces

ISO Cleanliness Classes Required by Process Step

Process AreaISO ClassParticles/m³ (≥ 0.5 µm)Particles/ft³ (≥ 0.5 µm)Why
Lithography bayISO 5 (Class 100)3,520100Open resist on wafer; particles print as defects
Wet bench / RCA cleanISO 5 (Class 100)3,520100Exposed wafer surfaces during chemical processing
Deposition (PECVD, evaporator)ISO 6 (Class 1,000)35,2001,000Wafer in sealed chamber; loading area matters most
Etch (ICP-RIE)ISO 6 (Class 1,000)35,2001,000Vacuum process; cleanroom protects load/unload
Metrology (SEM, ellipsometry)ISO 6–735,200–352,0001,000–10,000Measurement sensitivity; sample contamination prevention
Packaging / wire bondISO 7 (Class 10,000)352,00010,000Assembled device; less sensitive but particles affect bond quality
Gowning roomISO 7–8352,000–3,520,00010,000–100,000Transition zone; air shower at entry

Technical Specifications

Air Handling Unit (AHU) Requirements

ParameterSpecificationNotes
Total cleanroom area10,000–15,000 sq ftPhased buildout: Phase 1 = 5,000 sq ft
Ceiling height10 ft finished (14 ft slab-to-slab with interstitial)Raised floor + ceiling plenum for returns
Airflow (ISO 5 zones)60–90 ACH (air changes/hour)Vertical laminar flow at 0.3–0.5 m/s face velocity
Airflow (ISO 6–7 zones)20–40 ACHMixed-flow acceptable with HEPA ceiling coverage > 25%
Total supply air40,000–80,000 CFMBased on 10K sq ft at 60 ACH average
Recirculation ratio85–95% recirculated, 5–15% fresh makeupMakeup air tempered and pre-filtered
Temperature (lithography bay)20.0°C ± 0.1°CTightest zone; dedicated AHU recommended
Temperature (general cleanroom)21°C ± 0.5°CStandard semiconductor cleanroom setpoint
Humidity (lithography bay)45% ± 1% RHCritical for resist performance and ESD prevention
Humidity (general cleanroom)45% ± 5% RHBelow 30% RH causes ESD; above 60% causes condensation
Pressurization+0.03 to +0.05 in. w.g.Cascade: cleanest zone → gowning → corridor
Cooling capacity50–100 tons (175–350 kW thermal)Equipment heat load + lighting + personnel + envelope

Filtration System

Filter StageTypeEfficiencyLocationChange Interval
Pre-filterMERV 8 pleated panel30–35% @ 1 µmAHU intake3–6 months
Secondary filterMERV 14 bag/rigid90–95% @ 0.3 µmAHU downstream of coils6–12 months
Final filter (ISO 6–7)HEPA H1499.995% @ 0.12 µm (MPPS)Ceiling-mounted FFU or terminal5–10 years
Final filter (ISO 5)ULPA U15/U1699.9995% @ 0.12 µm (MPPS)Ceiling-mounted FFU7–12 years
Chemical filterActivated carbon + chemisorbent> 95% removal of AMC (organics, acids, bases)Makeup air or recirculation loop6–12 months

Fan Filter Units (FFUs)

ParameterSpecification
TypeMotorized fan filter unit with integrated EC motor
Size2 ft × 4 ft (standard ceiling grid); 4 ft × 4 ft available
Filter mediaMini-pleat HEPA (H14) or ULPA (U15) glass-fiber media
Airflow per unit400–800 CFM (adjustable via EC motor speed)
Face velocity0.35–0.50 m/s (70–100 fpm) nominal
Power per FFU100–250 W (EC motor, variable speed)
Noise< 55 dB(A) at rated flow
Ceiling coverage (ISO 5)80–100% of ceiling area
Ceiling coverage (ISO 6)25–40% of ceiling area
Ceiling coverage (ISO 7)15–25% of ceiling area
Quantity (10K sq ft, mixed ISO)200–400 FFUs total

Cleanroom Architecture

QLT CLEANROOM AIRFLOW DESIGN:

VERTICAL LAMINAR FLOW (ISO 5 Zones):

    ┌─────────────────────────────────┐
    │  INTERSTITIAL SPACE (ductwork)  │
    │  Supply from AHU → distribution │
    ├─────────────────────────────────┤
    │  ████ FFU ████ FFU ████ FFU ██  │  ← HEPA/ULPA ceiling (80-100%)
    │  ↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓  │  ← Laminar flow 0.45 m/s
    │                                 │
    │      [EQUIPMENT + WAFERS]       │  ← Work zone (10 ft clear)
    │                                 │
    │  ↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓  │
    ├─────────────────────────────────┤
    │  ▓▓▓▓ RAISED FLOOR (perforated) │  ← 18-24 in. raised floor
    │  Return air plenum → back to AHU│
    └─────────────────────────────────┘

PRESSURE CASCADE:
├── Lithography bay:    +0.05 in. w.g. (cleanest)
├── Process bays:       +0.04 in. w.g.
├── General cleanroom:  +0.03 in. w.g.
├── Gowning room:       +0.02 in. w.g.
└── Corridor/outside:   0.00 in. w.g. (reference)

AIR LOCK SEQUENCE:
├── Personnel entry: Corridor → Air shower → Gowning → Cleanroom
├── Material entry: Loading dock → Pass-through → Wipe-down → Cleanroom
└── Emergency egress: Crash-bar doors (break pressure seal)

Process Integration

QLT CLEANROOM HVAC INTEGRATION:

ZONE 1: LITHOGRAPHY BAY (ISO 5, 1,500 sq ft)
├── Dedicated AHU with reheat coil for ±0.1°C control
├── 100% ULPA ceiling coverage (150 FFUs, 2×4 ft)
├── Humidity: steam humidifier + desiccant dehumidifier
├── Chemical filtration on makeup air (AMC removal)
├── Equipment served: DUV stepper, contact aligner, spin coater
├── Heat load: ~30 kW (stepper dominates)
└── Exhaust: solvent exhaust from resist processing (50–100 CFM)

ZONE 2: DEPOSITION & ETCH BAY (ISO 6, 2,500 sq ft)
├── Shared AHU with Zone 3, zone reheat for ±0.5°C
├── 35% HEPA ceiling coverage (90 FFUs)
├── Equipment served: PECVD, ICP-RIE, sputtering, evaporator
├── Heat load: ~45 kW (vacuum pumps + RF generators)
├── Exhaust: process gas exhaust to scrubber (200–400 CFM)
└── Special: gas cabinet exhaust continuous (SiH₄ area)

ZONE 3: WET BENCH & CLEAN (ISO 5, 1,000 sq ft)
├── Dedicated AHU or split from Zone 1
├── 90% ULPA ceiling coverage (110 FFUs)
├── Equipment: RCA wet bench, solvent bench, spin-rinse-dryer
├── Heat load: ~15 kW
├── Exhaust: acid exhaust (HF, HCl) and solvent exhaust (acetone, IPA)
└── Special: acid-resistant ductwork (polypropylene or PVDF)

ZONE 4: METROLOGY & TEST (ISO 7, 2,000 sq ft)
├── AHU with ±1°C control (adequate for most instruments)
├── 20% HEPA ceiling coverage (50 FFUs)
├── Equipment: SEM, AFM, ellipsometer, optical test stations
├── Heat load: ~20 kW
├── Special: SEM room requires vibration isolation + EMI shielding
└── Temperature excursions affect measurement drift — monitor closely

ZONE 5: PACKAGING & ASSEMBLY (ISO 7, 2,000 sq ft)
├── Standard HVAC with HEPA ceiling terminals
├── 15% HEPA ceiling coverage (35 FFUs)
├── Equipment: die bonder, wire bonder, fiber attach station
├── Heat load: ~10 kW
└── Humidity important for wire bonding adhesion

Vendor Options & Pricing

HVAC System Vendors

VendorProduct LineCapacity RangeEst. Cost (10K sq ft)Notes
Trane / Ingersoll RandIntelliPak, Voyager, custom AHUs20–400+ tons$1,500,000–$2,500,000Full cleanroom HVAC packages; strong service network
Carrier / UTCAquaForce, custom AHUs20–500 tons$1,200,000–$2,200,000Chiller + AHU integrated solutions
DaikinMagnitude, custom cleanroom AHUs20–400 tons$1,300,000–$2,400,000Oil-free magnetic-bearing chillers; low vibration
MuntersIceDry, DryCool dehumidificationCustom$200,000–$500,000 (dehumid only)Desiccant dehumidification for tight RH control

Filtration & FFU Vendors

VendorProductUnit CostNotes
AAF InternationalAstroPure HEPA/ULPA FFUs$800–$1,500/unitIndustry standard; GMP and semiconductor grade
CamfilMegalam HEPA/ULPA panels, FFUs$900–$1,800/unitLowest pressure drop HEPA; energy-efficient
Envirco (Fedders)MAC-10 FFUs, IQ series$700–$1,200/unitWidely used in semiconductor fabs; EC motor standard
Terra UniversalFFUs, cleanroom panels, pass-throughs$600–$1,400/unitModular cleanroom components; fast delivery
Nippon MukiULPA filters, chemical filters$1,000–$2,000/unitHighest efficiency; used in leading-edge fabs

Total System Cost Breakdown

ComponentCost RangeNotes
AHUs (2–4 units, custom cleanroom)$400,000–$800,000Including coils, fans, controls, VFDs
Chiller plant (50–100 ton)$300,000–$600,000Air-cooled or water-cooled + cooling tower
FFUs (200–400 units)$200,000–$500,000HEPA/ULPA with EC motors
Ductwork and plenums$300,000–$600,000Galvanized supply, SS or PP for exhaust
Raised floor system$200,000–$400,000Perforated panels, pedestals, stringers; rated for equipment loads
Cleanroom wall/ceiling panels$300,000–$500,000Modular panels with gel-seal FFU frames
Building automation (BAS/BMS)$150,000–$300,000DDC controls, sensors, monitoring, alarm integration
Exhaust systems (process + general)$200,000–$400,000Acid, solvent, heat, and general exhaust with scrubber
Humidification / dehumidification$100,000–$250,000Steam humidifier + desiccant dehumid for lithography bay
Commissioning and validation$100,000–$200,000IQ/OQ, particle counts, airflow visualization, certification
TOTAL HVAC/CLEANROOM SYSTEM$4,000,000–$6,000,00010K–15K sq ft, ISO 5–7 mixed classification

Facility Requirements

Building Infrastructure

ParameterSpecification
Building typeIndustrial/R&D with 14+ ft slab-to-slab height
Floor loading200–500 lb/ft² (equipment zones); 100 lb/ft² (general)
Electrical service (HVAC)3-phase 480V, 400–600A dedicated to HVAC
HVAC power consumption150–300 kW continuous (fans, chillers, pumps)
Chilled water42°F supply / 56°F return (for AHU cooling coils)
Process cooling water65°F supply / 80°F return (for equipment chillers)
DI water18.2 MΩ·cm, < 1 ppb TOC for wet bench operations
Compressed dry air (CDA)80–100 psi, dewpoint -40°C, oil-free
Nitrogen (bulk)LN₂ tank → vaporizer → house N₂ at 80 psi
Exhaust capacity2,000–5,000 CFM total (acid + solvent + heat + general)
Roof accessRequired for AHUs, chillers, exhaust fans, cooling tower
Emergency powerGenerator for HVAC critical systems (fans + controls minimum)

Annual Operating Costs

ItemAnnual CostNotes
Electricity (HVAC systems)$180,000–$360,000200 kW avg × $0.10–0.20/kWh × 8,760 hrs
Filter replacements$30,000–$60,000Pre-filters 2×/yr, secondary 1×/yr, HEPA every 5–10 yr (amortized)
Chiller maintenance$15,000–$30,000Compressor service, refrigerant, water treatment
BAS/controls calibration$10,000–$20,000Sensor calibration, software updates
Annual certification (ISO 14644)$15,000–$30,000Particle counts, airflow tests, pressure differential verification
TOTAL ANNUAL OPERATING$250,000–$500,000

Safety & Handling

Hazard Summary

HazardSourceRisk LevelControls
Chemical exhaust failureLoss of exhaust fan serving acid/solvent benchesCRITICALRedundant exhaust fans; differential pressure alarms; auto-shutdown of chemical processes
Temperature excursionAHU failure or chiller tripHIGHBAS alarm cascade (email/SMS/siren); N+1 chiller redundancy; UPS on controls
Humidity excursionHumidifier failure or desiccant saturationMEDIUMDewpoint sensors in lithography bay; pause lithography if RH out of spec
Particle excursionFFU motor failure, filter seal leak, door held openMEDIUMContinuous particle counters in ISO 5 zones; FFU status monitoring
Pressure lossDoor stuck open, envelope breachLOWPressure monitors with visual/audible alarm; automatic door closers
Electrical (high voltage)480V distribution to AHUs and chillersMEDIUMLOTO procedures; arc-flash labeling; NFPA 70E compliance

Emergency Procedures

CLEANROOM HVAC EMERGENCY RESPONSE:

CHEMICAL EXHAUST FAILURE:
├── BAS alarm triggers immediately on loss of exhaust flow
├── Affected wet bench automatically shuts off chemical dispensing
├── Evacuate zone if toxic gas alarm triggers (SiH₄, HF, HCl)
├── Do NOT re-enter until exhaust is verified operational
└── Secondary exhaust fan auto-starts (if N+1 configured)

TEMPERATURE EXCURSION (> ±1°C from setpoint):
├── BAS sends alarm to facilities engineer (SMS + email)
├── Lithography operations PAUSE (thermal drift causes overlay errors)
├── Investigate: chiller status, AHU coil valve, outdoor conditions
├── Resume lithography only after 30 min of stable ±0.1°C readings
└── Log event in cleanroom deviation log

PARTICLE EXCURSION (ISO 5 zone exceeds Class 100):
├── Continuous particle counter triggers alarm
├── Stop all open-wafer processing (resist coat, develop)
├── Check: door seals, FFU status, personnel count, recent maintenance
├── Perform recovery count: 3 consecutive readings at Class 100
└── Resume processing after root-cause documented

POWER FAILURE:
├── Generator starts within 10 seconds (HVAC controls + critical fans)
├── Full HVAC restoration within 5 minutes
├── If extended outage: close all chemical containers, cover wafers
├── Monitor temperature and particle counts during recovery
└── Perform certification particle counts before resuming ISO 5 work