HVAC/HEPA Filtration System
Trane / AAF International HEPA CRITICAL ● ISO 5-7 cleanroom environment maintains sub-µm particle counts for lithographyRole in QLT Fabrication
Every nanoscale feature on the QLT photonic chip — 900 nm waveguides, 150 nm taper tips, 250 nm Poovey switch air gaps — is vulnerable to particle contamination. A single 0.5 µm particle landing on a waveguide during lithography or deposition creates a scattering defect that can add 0.1–1.0 dB of excess loss, potentially ruining a die. The HVAC/HEPA system creates and maintains the controlled cleanroom environment that makes sub-micron fabrication possible.
The cleanroom environment controls far more than just particles:
- Particle control ● HEPA/ULPA filtration removes airborne contaminants ≥ 0.12 µm that cause defects in lithography, deposition, and etch processes
- Temperature stability ● ±0.1°C in the lithography bay prevents thermal expansion/contraction of photomasks and wafers that would cause overlay errors exceeding 10 nm
- Humidity control ● ±1% RH prevents photoresist absorption of moisture (causes scumming and CD variation), electrostatic discharge damage to devices, and condensation on chilled optical surfaces
- Chemical vapor removal ● Activated carbon and chemical filters remove airborne molecular contamination (AMC) — volatile organics, acids, bases — that deposit on wafer surfaces and degrade film adhesion
- Positive pressure ● Cleanroom operates at +0.03–0.05" w.g. relative to surrounding spaces, preventing infiltration of unfiltered air through doors and pass-throughs
- Laminar flow ● Unidirectional (vertical) airflow at 0.3–0.5 m/s sweeps particles downward into return plenums, preventing recirculation across wafer surfaces
ISO Cleanliness Classes Required by Process Step
| Process Area | ISO Class | Particles/m³ (≥ 0.5 µm) | Particles/ft³ (≥ 0.5 µm) | Why |
|---|---|---|---|---|
| Lithography bay | ISO 5 (Class 100) | 3,520 | 100 | Open resist on wafer; particles print as defects |
| Wet bench / RCA clean | ISO 5 (Class 100) | 3,520 | 100 | Exposed wafer surfaces during chemical processing |
| Deposition (PECVD, evaporator) | ISO 6 (Class 1,000) | 35,200 | 1,000 | Wafer in sealed chamber; loading area matters most |
| Etch (ICP-RIE) | ISO 6 (Class 1,000) | 35,200 | 1,000 | Vacuum process; cleanroom protects load/unload |
| Metrology (SEM, ellipsometry) | ISO 6–7 | 35,200–352,000 | 1,000–10,000 | Measurement sensitivity; sample contamination prevention |
| Packaging / wire bond | ISO 7 (Class 10,000) | 352,000 | 10,000 | Assembled device; less sensitive but particles affect bond quality |
| Gowning room | ISO 7–8 | 352,000–3,520,000 | 10,000–100,000 | Transition zone; air shower at entry |
Technical Specifications
Air Handling Unit (AHU) Requirements
| Parameter | Specification | Notes |
|---|---|---|
| Total cleanroom area | 10,000–15,000 sq ft | Phased buildout: Phase 1 = 5,000 sq ft |
| Ceiling height | 10 ft finished (14 ft slab-to-slab with interstitial) | Raised floor + ceiling plenum for returns |
| Airflow (ISO 5 zones) | 60–90 ACH (air changes/hour) | Vertical laminar flow at 0.3–0.5 m/s face velocity |
| Airflow (ISO 6–7 zones) | 20–40 ACH | Mixed-flow acceptable with HEPA ceiling coverage > 25% |
| Total supply air | 40,000–80,000 CFM | Based on 10K sq ft at 60 ACH average |
| Recirculation ratio | 85–95% recirculated, 5–15% fresh makeup | Makeup air tempered and pre-filtered |
| Temperature (lithography bay) | 20.0°C ± 0.1°C | Tightest zone; dedicated AHU recommended |
| Temperature (general cleanroom) | 21°C ± 0.5°C | Standard semiconductor cleanroom setpoint |
| Humidity (lithography bay) | 45% ± 1% RH | Critical for resist performance and ESD prevention |
| Humidity (general cleanroom) | 45% ± 5% RH | Below 30% RH causes ESD; above 60% causes condensation |
| Pressurization | +0.03 to +0.05 in. w.g. | Cascade: cleanest zone → gowning → corridor |
| Cooling capacity | 50–100 tons (175–350 kW thermal) | Equipment heat load + lighting + personnel + envelope |
Filtration System
| Filter Stage | Type | Efficiency | Location | Change Interval |
|---|---|---|---|---|
| Pre-filter | MERV 8 pleated panel | 30–35% @ 1 µm | AHU intake | 3–6 months |
| Secondary filter | MERV 14 bag/rigid | 90–95% @ 0.3 µm | AHU downstream of coils | 6–12 months |
| Final filter (ISO 6–7) | HEPA H14 | 99.995% @ 0.12 µm (MPPS) | Ceiling-mounted FFU or terminal | 5–10 years |
| Final filter (ISO 5) | ULPA U15/U16 | 99.9995% @ 0.12 µm (MPPS) | Ceiling-mounted FFU | 7–12 years |
| Chemical filter | Activated carbon + chemisorbent | > 95% removal of AMC (organics, acids, bases) | Makeup air or recirculation loop | 6–12 months |
Fan Filter Units (FFUs)
| Parameter | Specification |
|---|---|
| Type | Motorized fan filter unit with integrated EC motor |
| Size | 2 ft × 4 ft (standard ceiling grid); 4 ft × 4 ft available |
| Filter media | Mini-pleat HEPA (H14) or ULPA (U15) glass-fiber media |
| Airflow per unit | 400–800 CFM (adjustable via EC motor speed) |
| Face velocity | 0.35–0.50 m/s (70–100 fpm) nominal |
| Power per FFU | 100–250 W (EC motor, variable speed) |
| Noise | < 55 dB(A) at rated flow |
| Ceiling coverage (ISO 5) | 80–100% of ceiling area |
| Ceiling coverage (ISO 6) | 25–40% of ceiling area |
| Ceiling coverage (ISO 7) | 15–25% of ceiling area |
| Quantity (10K sq ft, mixed ISO) | 200–400 FFUs total |
Cleanroom Architecture
QLT CLEANROOM AIRFLOW DESIGN:
VERTICAL LAMINAR FLOW (ISO 5 Zones):
┌─────────────────────────────────┐
│ INTERSTITIAL SPACE (ductwork) │
│ Supply from AHU → distribution │
├─────────────────────────────────┤
│ ████ FFU ████ FFU ████ FFU ██ │ ← HEPA/ULPA ceiling (80-100%)
│ ↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓ │ ← Laminar flow 0.45 m/s
│ │
│ [EQUIPMENT + WAFERS] │ ← Work zone (10 ft clear)
│ │
│ ↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓↓ │
├─────────────────────────────────┤
│ ▓▓▓▓ RAISED FLOOR (perforated) │ ← 18-24 in. raised floor
│ Return air plenum → back to AHU│
└─────────────────────────────────┘
PRESSURE CASCADE:
├── Lithography bay: +0.05 in. w.g. (cleanest)
├── Process bays: +0.04 in. w.g.
├── General cleanroom: +0.03 in. w.g.
├── Gowning room: +0.02 in. w.g.
└── Corridor/outside: 0.00 in. w.g. (reference)
AIR LOCK SEQUENCE:
├── Personnel entry: Corridor → Air shower → Gowning → Cleanroom
├── Material entry: Loading dock → Pass-through → Wipe-down → Cleanroom
└── Emergency egress: Crash-bar doors (break pressure seal)
Process Integration
QLT CLEANROOM HVAC INTEGRATION: ZONE 1: LITHOGRAPHY BAY (ISO 5, 1,500 sq ft) ├── Dedicated AHU with reheat coil for ±0.1°C control ├── 100% ULPA ceiling coverage (150 FFUs, 2×4 ft) ├── Humidity: steam humidifier + desiccant dehumidifier ├── Chemical filtration on makeup air (AMC removal) ├── Equipment served: DUV stepper, contact aligner, spin coater ├── Heat load: ~30 kW (stepper dominates) └── Exhaust: solvent exhaust from resist processing (50–100 CFM) ZONE 2: DEPOSITION & ETCH BAY (ISO 6, 2,500 sq ft) ├── Shared AHU with Zone 3, zone reheat for ±0.5°C ├── 35% HEPA ceiling coverage (90 FFUs) ├── Equipment served: PECVD, ICP-RIE, sputtering, evaporator ├── Heat load: ~45 kW (vacuum pumps + RF generators) ├── Exhaust: process gas exhaust to scrubber (200–400 CFM) └── Special: gas cabinet exhaust continuous (SiH₄ area) ZONE 3: WET BENCH & CLEAN (ISO 5, 1,000 sq ft) ├── Dedicated AHU or split from Zone 1 ├── 90% ULPA ceiling coverage (110 FFUs) ├── Equipment: RCA wet bench, solvent bench, spin-rinse-dryer ├── Heat load: ~15 kW ├── Exhaust: acid exhaust (HF, HCl) and solvent exhaust (acetone, IPA) └── Special: acid-resistant ductwork (polypropylene or PVDF) ZONE 4: METROLOGY & TEST (ISO 7, 2,000 sq ft) ├── AHU with ±1°C control (adequate for most instruments) ├── 20% HEPA ceiling coverage (50 FFUs) ├── Equipment: SEM, AFM, ellipsometer, optical test stations ├── Heat load: ~20 kW ├── Special: SEM room requires vibration isolation + EMI shielding └── Temperature excursions affect measurement drift — monitor closely ZONE 5: PACKAGING & ASSEMBLY (ISO 7, 2,000 sq ft) ├── Standard HVAC with HEPA ceiling terminals ├── 15% HEPA ceiling coverage (35 FFUs) ├── Equipment: die bonder, wire bonder, fiber attach station ├── Heat load: ~10 kW └── Humidity important for wire bonding adhesion
Vendor Options & Pricing
HVAC System Vendors
| Vendor | Product Line | Capacity Range | Est. Cost (10K sq ft) | Notes |
|---|---|---|---|---|
| Trane / Ingersoll Rand | IntelliPak, Voyager, custom AHUs | 20–400+ tons | $1,500,000–$2,500,000 | Full cleanroom HVAC packages; strong service network |
| Carrier / UTC | AquaForce, custom AHUs | 20–500 tons | $1,200,000–$2,200,000 | Chiller + AHU integrated solutions |
| Daikin | Magnitude, custom cleanroom AHUs | 20–400 tons | $1,300,000–$2,400,000 | Oil-free magnetic-bearing chillers; low vibration |
| Munters | IceDry, DryCool dehumidification | Custom | $200,000–$500,000 (dehumid only) | Desiccant dehumidification for tight RH control |
Filtration & FFU Vendors
| Vendor | Product | Unit Cost | Notes |
|---|---|---|---|
| AAF International | AstroPure HEPA/ULPA FFUs | $800–$1,500/unit | Industry standard; GMP and semiconductor grade |
| Camfil | Megalam HEPA/ULPA panels, FFUs | $900–$1,800/unit | Lowest pressure drop HEPA; energy-efficient |
| Envirco (Fedders) | MAC-10 FFUs, IQ series | $700–$1,200/unit | Widely used in semiconductor fabs; EC motor standard |
| Terra Universal | FFUs, cleanroom panels, pass-throughs | $600–$1,400/unit | Modular cleanroom components; fast delivery |
| Nippon Muki | ULPA filters, chemical filters | $1,000–$2,000/unit | Highest efficiency; used in leading-edge fabs |
Total System Cost Breakdown
| Component | Cost Range | Notes |
|---|---|---|
| AHUs (2–4 units, custom cleanroom) | $400,000–$800,000 | Including coils, fans, controls, VFDs |
| Chiller plant (50–100 ton) | $300,000–$600,000 | Air-cooled or water-cooled + cooling tower |
| FFUs (200–400 units) | $200,000–$500,000 | HEPA/ULPA with EC motors |
| Ductwork and plenums | $300,000–$600,000 | Galvanized supply, SS or PP for exhaust |
| Raised floor system | $200,000–$400,000 | Perforated panels, pedestals, stringers; rated for equipment loads |
| Cleanroom wall/ceiling panels | $300,000–$500,000 | Modular panels with gel-seal FFU frames |
| Building automation (BAS/BMS) | $150,000–$300,000 | DDC controls, sensors, monitoring, alarm integration |
| Exhaust systems (process + general) | $200,000–$400,000 | Acid, solvent, heat, and general exhaust with scrubber |
| Humidification / dehumidification | $100,000–$250,000 | Steam humidifier + desiccant dehumid for lithography bay |
| Commissioning and validation | $100,000–$200,000 | IQ/OQ, particle counts, airflow visualization, certification |
| TOTAL HVAC/CLEANROOM SYSTEM | $4,000,000–$6,000,000 | 10K–15K sq ft, ISO 5–7 mixed classification |
Facility Requirements
Building Infrastructure
| Parameter | Specification |
|---|---|
| Building type | Industrial/R&D with 14+ ft slab-to-slab height |
| Floor loading | 200–500 lb/ft² (equipment zones); 100 lb/ft² (general) |
| Electrical service (HVAC) | 3-phase 480V, 400–600A dedicated to HVAC |
| HVAC power consumption | 150–300 kW continuous (fans, chillers, pumps) |
| Chilled water | 42°F supply / 56°F return (for AHU cooling coils) |
| Process cooling water | 65°F supply / 80°F return (for equipment chillers) |
| DI water | 18.2 MΩ·cm, < 1 ppb TOC for wet bench operations |
| Compressed dry air (CDA) | 80–100 psi, dewpoint -40°C, oil-free |
| Nitrogen (bulk) | LN₂ tank → vaporizer → house N₂ at 80 psi |
| Exhaust capacity | 2,000–5,000 CFM total (acid + solvent + heat + general) |
| Roof access | Required for AHUs, chillers, exhaust fans, cooling tower |
| Emergency power | Generator for HVAC critical systems (fans + controls minimum) |
Annual Operating Costs
| Item | Annual Cost | Notes |
|---|---|---|
| Electricity (HVAC systems) | $180,000–$360,000 | 200 kW avg × $0.10–0.20/kWh × 8,760 hrs |
| Filter replacements | $30,000–$60,000 | Pre-filters 2×/yr, secondary 1×/yr, HEPA every 5–10 yr (amortized) |
| Chiller maintenance | $15,000–$30,000 | Compressor service, refrigerant, water treatment |
| BAS/controls calibration | $10,000–$20,000 | Sensor calibration, software updates |
| Annual certification (ISO 14644) | $15,000–$30,000 | Particle counts, airflow tests, pressure differential verification |
| TOTAL ANNUAL OPERATING | $250,000–$500,000 |
Safety & Handling
Hazard Summary
| Hazard | Source | Risk Level | Controls |
|---|---|---|---|
| Chemical exhaust failure | Loss of exhaust fan serving acid/solvent benches | CRITICAL | Redundant exhaust fans; differential pressure alarms; auto-shutdown of chemical processes |
| Temperature excursion | AHU failure or chiller trip | HIGH | BAS alarm cascade (email/SMS/siren); N+1 chiller redundancy; UPS on controls |
| Humidity excursion | Humidifier failure or desiccant saturation | MEDIUM | Dewpoint sensors in lithography bay; pause lithography if RH out of spec |
| Particle excursion | FFU motor failure, filter seal leak, door held open | MEDIUM | Continuous particle counters in ISO 5 zones; FFU status monitoring |
| Pressure loss | Door stuck open, envelope breach | LOW | Pressure monitors with visual/audible alarm; automatic door closers |
| Electrical (high voltage) | 480V distribution to AHUs and chillers | MEDIUM | LOTO procedures; arc-flash labeling; NFPA 70E compliance |
Emergency Procedures
CLEANROOM HVAC EMERGENCY RESPONSE: CHEMICAL EXHAUST FAILURE: ├── BAS alarm triggers immediately on loss of exhaust flow ├── Affected wet bench automatically shuts off chemical dispensing ├── Evacuate zone if toxic gas alarm triggers (SiH₄, HF, HCl) ├── Do NOT re-enter until exhaust is verified operational └── Secondary exhaust fan auto-starts (if N+1 configured) TEMPERATURE EXCURSION (> ±1°C from setpoint): ├── BAS sends alarm to facilities engineer (SMS + email) ├── Lithography operations PAUSE (thermal drift causes overlay errors) ├── Investigate: chiller status, AHU coil valve, outdoor conditions ├── Resume lithography only after 30 min of stable ±0.1°C readings └── Log event in cleanroom deviation log PARTICLE EXCURSION (ISO 5 zone exceeds Class 100): ├── Continuous particle counter triggers alarm ├── Stop all open-wafer processing (resist coat, develop) ├── Check: door seals, FFU status, personnel count, recent maintenance ├── Perform recovery count: 3 consecutive readings at Class 100 └── Resume processing after root-cause documented POWER FAILURE: ├── Generator starts within 10 seconds (HVAC controls + critical fans) ├── Full HVAC restoration within 5 minutes ├── If extended outage: close all chemical containers, cover wafers ├── Monitor temperature and particle counts during recovery └── Perform certification particle counts before resuming ISO 5 work